Your roof is your cheapest power plant.
Shops, offices, factories, warehouses, schools and hospitals pay the highest tariffs and use most of their power in daylight. That makes commercial rooftop solar one of the quickest paybacks in NCR, often three to five years.

Who it suits
Factories and warehouses
Large tin-shed or RCC roofs in Faridabad, Manesar, Noida Phase 2 and Mohali. Daytime shifts use almost every unit.
Offices and showrooms
AC-heavy daytime loads in Gurugram, Noida and Delhi commercial blocks.
Schools and colleges
Open roofs, daytime use and a visible lesson for students.
Hospitals and hotels
Round-the-clock loads where solar trims the daytime peak and diesel use.
What a commercial project looks like
- Load study. Twelve months of bills, your sanctioned load and, if available, a day of meter data to see when you use power.
- Roof and structure check. Sheet roofs need purlin checks and the right clamps; RCC roofs need waterproofing-safe anchors.
- Design and yield report. Layout, string design, expected units per month and a simple cash flow.
- Financing choice. Capex, term loan or RESCO.
- Approvals. DISCOM feasibility, net or gross metering, and electrical inspectorate where required.
- Build and commissioning. Scheduled around your shifts, with safety plans for working at height.
- Monitoring and O&M. String-level monitoring, cleaning schedules and periodic thermal checks.

Metering rules by state
| Area | DISCOM | What to know |
|---|---|---|
| Delhi | BSES, Tata Power-DDL, NDMC | Net, group and virtual net metering. C&I keeps the five-year generation based incentive. |
| Gurugram, Faridabad | DHBVN | Net metering capped at 500 kW per connection. |
| Noida, Ghaziabad, Greater Noida | PVVNL, NPCL | System up to 100% of sanctioned load. |
| Mohali | PSPCL | Net metering, net billing, group, gross and virtual net metering allowed since April 2026. |
Tax and finance
Businesses can usually claim depreciation on a solar plant, which improves the return in the first years. Ask your CA how it applies to your company. If you would rather not spend capital, a RESCO agreement gets you lower-cost power from day one with the developer handling maintenance. See loans and EMI.
We have done 300+ installations across NCR and the tricity. Book a site assessment and we will send a yield report with your actual tariff.
Common questions
Do businesses get a subsidy for rooftop solar?
What is the payback for a factory rooftop system?
How big can a commercial rooftop system be?
Can we get solar without paying upfront?
Put the sun's chariot on your roof.
One visit tells you how many units your roof can make, what the subsidy covers and what you will pay. The survey is free and there is no obligation.
- PM Surya Ghar registered process and paperwork handled
- India-made (DCR) panels that qualify for subsidy
- Five years of maintenance on every home system
Prefer to talk? +91 96502 10909 or WhatsApp us