Rooftop solar in Faridabad

Short answer

A 3 kW home system in Faridabad costs about ₹2.2 to 2.4 lakh before subsidy and about ₹1.42 to 1.62 lakh after the ₹78,000 PM Surya Ghar subsidy. Factories pay less per kW as systems grow: a 10 kW system costs roughly ₹5.9 to 6.1 lakh. DHBVN approves net metering for systems up to 500 kW.

Konark-style chariot wheel
At a glance
DISCOMDHBVN
State nodal agencyHAREDA
Central subsidy (homes)Up to ₹78,000 (3 kW and above)
Extra grantAntyodaya families: ₹25,000 per kW or 40% of cost, up to 2 kW
10 kW systemAbout ₹5.9 to 6.1 lakh before any subsidy
Net meteringHERC 2021 regulations, up to 500 kW
Mandatory solarPlots 500 sq yd and above

What does rooftop solar cost in Faridabad?

For a home, a 3 kW system costs about ₹1.42 to 1.62 lakh after the central subsidy, and 5 kW about ₹2.52 to 2.82 lakh. For businesses there is no PM Surya Ghar subsidy, but the price per kW drops as the system grows. All figures are 2026 market prices, as of November 2026.

SystemBefore subsidySubsidyYou payUnits a year
3 kW home₹2.2 to 2.4 lakh₹78,000 central₹1.42 to 1.62 lakh4,200 to 4,350
5 kW home₹3.3 to 3.6 lakh₹78,000 central₹2.52 to 2.82 lakh7,000 to 7,250
10 kW shop or unit₹5.9 to 6.1 lakhNone₹5.9 to 6.1 lakh14,000 to 14,500

Your rough yearly saving is the units in the last column multiplied by your DHBVN rate. For a home that rate depends on your slab; for a factory it is the industrial tariff, which is why commercial systems earn back fastest. For most homes the central subsidy is the whole discount; families covered by Haryana's Antyodaya scheme get an extra grant, explained below. Our price guide has more detail.

Solar for factories in the sectors and NIT

Faridabad is one of NCR's oldest industrial towns, and its factories are where rooftop solar pays back fastest. Units in the industrial sectors such as 24, 25, 58 and 59, and in the older NIT areas, run machines through the day, exactly when solar produces.

What makes a factory roof different

  • Metal sheet roofs. Many sheds have trapezoidal or corrugated sheets. These take a clamp-based mounting that does not drill through the sheet, so the roof stays watertight. We check the sheet gauge, purlins and skylights first.
  • Daytime load. A unit that runs one shift can use nearly everything the roof makes, with little left to export. That is the best case for savings.
  • Dust. Forging and foundry work put more dust in the air. Panels on these roofs need a washing schedule, weekly at least, and a tap point and safe walkway on the roof.
  • Size. HERC's 2021 net metering regulations allow up to 500 kW, which covers most single-site units in Faridabad.

What to check before you sign

Ask any installer three things. First, are the modules on ALMM List-I with List-II cells? For net-metered projects commissioned on or after 1 June 2026 this is required, so it is not optional for a factory either. Second, do the modules meet IS 14286 and IS/IEC 61730, and the inverter IS 16221? Third, what does the performance warranty say? Modules should keep at least 90% output at 12 years and 80% at 25 years. We put all three in writing in the quote.

Businesses also get accelerated depreciation on solar assets, which improves the case further. We can quote outright purchase or EMI. Read more on commercial solar.

Twelve months, twelve charioteers: what 1 kW makes each month in Delhi NCR050100150Jan: about 98 units98JanFeb: about 112 units112FebMar: about 140 units140MarApr: about 150 units150AprMay: about 154 units154MayJun: about 134 units134JunJul: about 110 units110JulAug: about 108 units108AugSep: about 120 units120SepOct: about 126 units126OctNov: about 104 units104NovDec: about 92 units92Dec
Estimated units from 1 kW of rooftop solar in Delhi NCR across a typical year, about 1,440 in total. A factory sizing for summer production can see March to May carry the most output.

Home subsidy and how to apply with DHBVN

Faridabad homes get the central PM Surya Ghar subsidy of up to ₹78,000 and apply through the national portal, with DHBVN handling the technical side and HAREDA as the state nodal agency. Haryana is aiming for 2.22 lakh rooftops by 31 March 2027.

The steps: register on pmsuryaghar.gov.in with your DHBVN account number, choose a registered vendor, wait for DHBVN's feasibility check, upload the signed agreement and get the system installed with India-made DCR panels. DHBVN then inspects and fits the net meter. Once the commissioning certificate is issued you add bank details and the subsidy arrives by direct transfer.

Families with income up to ₹1.8 lakh can also apply for the Haryana Antyodaya grant: ₹25,000 per kW or 40% of the cost, whichever is lower, for up to 2 kW, on top of the central subsidy. The exact amount depends on your income band, so we confirm your figure at survey.

How net metering works with DHBVN

DHBVN replaces your meter with a two-way net meter after inspecting the system, and your bill then shows units imported, exported and the net. It works the same way for a 3 kW house in Sector 15 and a 200 kW roof in an industrial sector, under HERC's 2021 regulations.

For factories, we look at your sanctioned load and contract demand, check the transformer and design the system so it fits within the rules. For homes, the main wait is the inspection and meter fitting; the roof work itself is one to three days. We file, follow up and keep you posted. See net metering in Delhi NCR.

Sector homes, NIT houses and Greater Faridabad societies

Faridabad's homes fall into three groups, and each needs a slightly different plan.

HSVP sector houses in sectors like 14, 15, 16, 21 and 28 sit on wide plots with flat RCC roofs. Plots of 500 sq yd and above must install at least 1 kWp or 5% of sanctioned load under a 2014 Haryana notification linked to the occupancy certificate, so if you are rebuilding, plan solar with the drawings.

NIT houses in the older numbered areas are closer together, and neighbours have often built upward. Shade mapping matters here: we track the shadow of the neighbour's floor through the day before placing panels. You need about 80 to 100 sq ft of shade-free roof per kW. Where roof space is tight, a raised structure over the water tank or stairwell often adds the last kW you need.

Greater Faridabad societies across the Neharpar sectors have newer towers with large roofs. Common facilities get ₹18,000 per kW in central subsidy, up to 500 kW, and we work with the RWA through the AGM. See solar for societies.

Why Konarq in Faridabad

We have done 300+ installations across NCR and the tricity, for homes, societies and businesses. Whether it is a kothi or a forging unit, the work follows the same seven steps: bill check, roof survey, design and a fixed quote, paperwork, installation, net meter and inspection, and subsidy or handover. Konark was built as a chariot pulled by seven horses; our seven steps pull your project from first call to first unit.

Every home system comes with five years of care, and every business system with monitoring for each string, so a dirty or faulty panel shows up quickly. Panels are India-made, with at least 90% output at 12 years and 80% at 25 years.

Running a unit or a home in Faridabad? Book a free roof survey and get a layout, yearly units and one fixed price.

Common questions

How much does a solar system cost for a factory in Faridabad?
Price per kW falls as systems grow. As a guide, BSES quoted about ₹65,000 per kW up to 5 kW, about ₹60,000 for 6 to 10 kW and about ₹55,000 above 10 kW, and a 10 kW system is roughly ₹5.9 to 6.1 lakh in 2026. Larger industrial roofs are quoted after a survey. See commercial solar.
Do factories get the PM Surya Ghar subsidy?
No. PM Surya Ghar is for homes, and for housing societies' common facilities. Businesses pay the full price, but they pay commercial or industrial tariffs, so each unit of solar saves more and the payback is fast.
Can my factory's metal sheet roof take solar panels?
Usually, yes. Sheet roofs need a lighter, clamp-based mounting instead of the RCC structures used on homes. At survey we check the sheet, the purlins and any skylights, and confirm the roof can carry the load before we propose a layout.
What is the solar subsidy for homes in Faridabad?
The central PM Surya Ghar subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000. Families covered by Haryana's Antyodaya scheme can get an extra grant. See the subsidy guide.
Is solar compulsory for big plots in Faridabad?
Yes, for plots of 500 sq yd and above. A 2014 Haryana notification requires at least 1 kWp or 5% of sanctioned load, linked to the occupancy certificate. We size it to cut your bill, not just to pass the rule.
300+ rooftops and counting

Put the sun's chariot on your roof.

One visit tells you how many units your roof can make, what the subsidy covers and what you will pay. The survey is free and there is no obligation.

  • PM Surya Ghar registered process and paperwork handled
  • India-made (DCR) panels that qualify for subsidy
  • Five years of maintenance on every home system

Prefer to talk? +91 96502 10909 or WhatsApp us

Book a free roof survey

Leave your number. An engineer calls within one working day, reads your bill and tells you the right size and subsidy.

No spam, no sharing your number. We call once, and on WhatsApp only if you ask.

Free roof survey